Since 2003 SBSS have leveraged our versatile vessels and world leading marine installation capabilities into the demanding and high risk offshore oil and gas sector, providing a wide range of subsea construction services, and always with the utmost focus on HSE and quality.

With Asia’s most advanced fleet of DP cable installation vessels and proven expertise in subsea technology, SBSS have played a pivotal role in a number of key oil and gas projects throughout Asia and the Middle East, working for the region’s leading EPC players.

Operating our own integrated assets together with our in-house engineering capability and a certified project management structure, SBSS have successfully transferred our expertise in delivering subsea cable solutions right first time and established an enviable track record in the industry, with the following just some of our capabilities:

  • Inter-platform Installation of Power, Fibre Optic and Composite Cable
  • Subsea Umbilical, Riser and Flowline (SURF) installation
  • Cable and Pipeline Trenching
  • Design, Engineering and Installation of Protection Measures Including Mattressing, Uraduct and Grouting
  • Front End Engineering and Design (FEED)
  • Saturation Diving Support Vessel Provision
  • Offshore Support and Construction Vessel Provision
  • Subsea Inspection, Repair and Maintenance (IRM)

Projects Customer Year Work Max Depth(m)
Wenchang subsea cable installation COOEC 2014 19.3 kilometers static subsea cable installation 123
Huangyan subsea cable installation and trenching COOEC 2014 3 Power Cables laying for 52.3 Kilometers between Platforms 102
Enping Power Cable Installation COOEC 2014 3 Power Cables laying for 52.3 Kilometers between Platforms 105
Panyu Trenching and Liwan Grouting COOEC 2014 Panyu Trenching and Liwan Grouting 108
Huangyan Mattress Installation COOEC 2014 Mattress Installation/Jacket Leveling Check and Hydraulic compensation 107
Indonesia Naga Pelikam Inter-Platform Cable Link Project Swiber 2013 Inter-platform Installation of 3 Segments of power cables and umbilicals 85
Qatar Barzan Inter-Platform Cable Link Project Subtech 2013 Inter platform installation of 6 segments of power and Fiber optic cables 90
KJO


Overview:

By July 2013, the KJO project has been completed successfully for COOEC by utilizing of Bold Maverick, the vessel of subsea cable installation belonging to SBSS, which is designed for oil and gas industry. During this project, 17 power cables in various specifications (about 70 km length) were laid perfectly.

In the different environment and custom, SBSS’s best team has overcome many troubles and solved a lot of problems such as the extreme climate and completed the subsea cable installation with high quality. Meanwhile, the equipments have been redesigned and improved to adapt to the task. In addition, the details are focused to meet the requirement of project and environment.

Project Key Information

Customer: COOEC
Location:  the Middle East
Project Time:2011/2013
Scope of Work:17 power cables laying (about 70 km length)
Cable Parameter:
Specification 1—— 40kV/OD161mm/ Weight in air 56kg/m
Specification 2—— 5kV/OD130mm/ Weight in air 44kg/m
Installation Vessel:Bold Maverick
Specific Engineering:
-    Professional cable laying equipment
-    Dynamic installing cable arm
-    Dynamic wheel back twisting frame
-    Tensioner
-    Cable Sliding

COOEC 2013 17 power cables laying 70
Total E&P Project Hallin Marine 2011 Chartered as DSV for various activities in oil field 80
Shell Cili Padi Malaysia Project IEV 2011 31km 11kV inter-platform cable installation & 500m post lay burial 90
Wen Chang Power Cable Repair CNOOC 2010 Repair the composite power cable 140
Pipeline Post Lay Trenching for Shanghai LNG Project TianJin JunHao Offshore Engineering Co. Ltd. 2008-2009 Work as trenching support platform for 30km pipeline post lay trenching 60
BP Tangguh Power Cable Project Saipem 2007 Installed and Buried 44 km power cable 70
Retrofit Anode Installation Project Iranian Offshore Oil Co. 2007 Chartered as DSV for various activities in oil field 50
Sakhalin Phase 2 Develop Project Saipem Asia SDN BHD 2006 Chartered as DSV for various activities in oil field 70
HHI PTT Project in Gulf of Thailand Hallin Marine Systems Ltd. 2006 Chartered as DSV for various activities in oil field 62
Modec Project in Indonesia Hallin Marine Systems Ltd. 2005 Chartered as DSV for various activities in oil field 85
Chunxiao Power Cable CNOOC 2005 Installed and Buried 20 km power cable 100
Cuel Campaign Golf of Thailand Hallin Marine Systems Ltd. 2005 Chartered as DSV for various activities in oil field
Lamma Gas Pipeline Crossing Mattress Installation Hallin Marine Systems Ltd. 2005 Chartered as DP2 vessel to support the mattress installation 35
Removal of Riser System on Xijiang Field Hallin Marine Systems Ltd. 2005 Chartered as DSV to support the riser system removal 100
Malampaya Field Underbuoy Hose Replacement Hallin Marine Systems Ltd. 2005 Chartered as DSV to replace two centenary anchored leg mooring under buoy hoses 70
Pipeline Post Lay Trenching for Chun Xiao Offshore Oil Project Tian Jin Tang Gu Marine Engineering Company 2004-2005 Work as trenching support platform for 120km pipeline post lay trenching 60
Lamma Gas Pipeline Crossing Pre-lay Survey Saipem Asia SDN BHD 2004 ROV Inspection for Gas Pipeline Route Survey 35
Installation of Riser System on Xijiang Field Hallin Marine Systems Ltd. 2004 Chartered as DSV to support the riser system installation 100
Hui Zhou 19/ 3-2-1 Project Hallin Marine Systems Ltd. 2004 Chartered as DSV to support pipeline installation; laying of 32km power cable 110
Indonesia Langsa FPSO Hallin Marine Systems Ltd. 2004 Chartered as DSV to support FPSO survey and flowline disconnection 70
India PY#3 Flowline Repair Hallin Marine Systems Ltd. 2004 Chartered as Dive Support Vessel to support flowline repair 71
Dong Fang 1-1 Gas Field Export Pipeline Laying Project in South China Sea Offshore Oil Engineering Co., Ltd. (COOEC) 2003 Chartered as DP platform to support pipe trenching work; laying of 4km of 15KV power cable, including J-tube pull to platform 70